The LiquidEdge AI POD is a complete liquid-cooled AI datacenter inside a 40-ft North American-spec ISO container. It is assembled and tested at the factory, then arrives on site ready to connect, with no civil works and fewer than five crew members needed at installation.

Conventional datacenter builds can take 36 months or more because of grid interconnect queues, permitting and construction. The POD was engineered to remove that bottleneck: wherever power is available, from industrial sites to urban brownfields, it goes from factory to live in about eight weeks. Noviant offers it in partnership with LiquidEdge, backed by its majority owner Aether Compute.

Who it's for

  • Neocloud operators and GPU-as-a-Service providers adding capacity fast
  • Enterprises running AI inference or fine-tuning close to their data
  • Teams training large language models that need hyperscaler bridge capacity
  • Sites with available power but no room or time for a traditional build

What's included

  • Direct liquid cooling

    Cold-plate technology captures at least 80% of GPU heat into the coolant loop, for an annualized PUE of 1.15 or better against the 1.50 to 1.70 typical of air-cooled rooms.

  • Three tiers, one architecture

    LE-44 single rack for edge and inference, LE-88 twin rack for Neocloud and GPU-as-a-Service, LE-200 quad rack for LLM training and hyperscaler bridge capacity.

  • Broad GPU support

    Configurations for NVIDIA GB200, H100, H200, B200 and RTX 5090, and AMD MI300X.

  • Built for the outdoors

    IP55-rated enclosure operating from -40°C to +50°C, fully relocatable and redeployable.

  • North American compliance

    Designed to UL 891, NEC 2023, NFPA 75/76 and ASHRAE TC 9.9.

  • Integrated AIOps

    More than 4,000 telemetry points per unit, a CFD-validated digital twin for workload simulation, and predictive maintenance that flags hardware degradation 72 hours or more in advance.

Liquid-Cooled AI Datacenter Container

LiquidEdge AI POD

Offered by Noviant with LiquidEdge, backed by its majority owner Aether Compute.

Annualized PUE
≤ 1.15
Factory to live
8 weeks
Enclosure
40-ft ISO, IP55
Operating range
-40°C to +50°C
IT load
44 to 200 kW
GPU support
NVIDIA GB200, H100, H200, B200, RTX 5090 and AMD MI300X

North America compliant: UL 891, NEC 2023, NFPA 75/76, ASHRAE TC 9.9.

Three LiquidEdge AI POD Tiers, One Architecture

LiquidEdge AI PODLE-44

Single-Rack · Edge

  • 44 kW IT
  • 64× RTX 5090 · 32× H100/H200 · 24× B200
  • Inference · Fine-tuning · Edge AI

Flagship Model

LiquidEdge AI PODLE-88

Twin-Rack · Mainstream

  • 88 kW IT
  • 128× RTX 5090 · 64× H100/H200
  • Neocloud · GPU-as-a-Service

LiquidEdge AI PODLE-200

Quad-Rack · Heavy

  • 200 kW IT
  • 1× GB200 NVL72 (72 GPUs) · 256× RTX 5090
  • LLM Training · Hyperscaler Bridge

Every tier is factory-built and live in about 8 weeks, uses direct liquid cooling for a PUE of 1.15 or better, and supports NVIDIA and AMD MI300X GPUs. Offered with LiquidEdge, backed by its majority owner Aether Compute.

How we deliver it

  1. 01

    Assess

    We review your power availability, GPU requirements and timeline to choose the right tier.

  2. 02

    Build

    The POD is assembled and tested at the factory while the site connection is prepared.

  3. 03

    Install

    It arrives ready to connect; a small crew brings it live, about eight weeks from order.

  4. 04

    Operate

    Noviant supports and monitors the POD, with predictive maintenance from the AIOps platform.

Why clients trust Noviant

ISO/IEC 27001:2022 Certified

Certified since October 26, 2019; certified to ISO/IEC 27001:2022 since October 26, 2025 (valid through October 25, 2028). Certificate No. 382119.00, issued by DEKRA Certification, Inc., an ANAB-accredited certification body. Scope: Managed services including Cybersecurity, Cloud Solutions, Data Analytics, and Data Infrastructure.

New York State Minority and Women's Business Enterprise (MWBE) Certified

Helping state and city agencies meet their Article 15-A goals for minority and women-owned business participation.

Frequently asked questions

How long does a LiquidEdge AI POD take to deploy?

About eight weeks from factory to live. The POD is built and tested at the factory, so on-site work is limited to connecting power, cooling and network.

Which tier do I need?

LE-44 (44 kW) suits inference, fine-tuning and edge AI. LE-88 (88 kW) is designed for Neocloud operators and GPU-as-a-Service. LE-200 (200 kW) supports a full NVIDIA GB200 NVL72 system for large language model training. We size it with you based on workload and available power.

Which GPUs are supported?

Configurations support NVIDIA GB200, H100, H200, B200 and RTX 5090, as well as AMD MI300X.

What does PUE ≤ 1.15 mean for running costs?

PUE compares total facility power with the power used by IT equipment. At 1.15 or better, far less energy goes to cooling than in typical air-cooled rooms at 1.50 to 1.70.

Can the POD be moved later?

Yes. It is a standard 40-ft ISO container and is fully relocatable and redeployable.